Fort Tryon Park

Fort Tryon Park Zone 6

Bway Sidewalk And Adjacent Path From E-W Path Near Sherman Av To Riverside Dr
Last 10 Inspections
Overall Condition AcceptableCleanliness Acceptable
8 of 109 of 10
Inspection DateOverall ConditionCleanlinessUnacceptable Features
2/25/2025AcceptableAcceptable
    10/8/2024AcceptableAcceptable
      4/9/2024AcceptableAcceptable
      • Lawns
      11/28/2023AcceptableAcceptable
        8/1/2023UnacceptableUnacceptable
        • Paved Surface
        • Weeds
        3/28/2023AcceptableAcceptable
          10/20/2022AcceptableAcceptable
            5/12/2022UnacceptableAcceptable
            • Paved Surface
            12/3/2021AcceptableAcceptable
            • Litter
            • Trees
            7/9/2021AcceptableAcceptable
            • Paved Surface